Mathematical model description - GEM-E3: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 6: | Line 6: | ||
The general specification of the 1st stage problem, with a time separable Stone-Geary utility function, can be written as follows: | The general specification of the 1st stage problem, with a time separable Stone-Geary utility function, can be written as follows: | ||
:<math> maxU_{er,t} </math> | : <math> maxU_{er,t} </math> | ||
Revision as of 11:23, 18 October 2016
| Corresponding documentation | |
|---|---|
| Previous versions | |
| Model information | |
| Model link | |
| Institution | Institute of Communication And Computer Systems (ICCS), Greece, https://www.iccs.gr/en/. |
| Solution concept | General equilibrium (closed economy) |
| Solution method | Optimization |
| Anticipation | |
The general specification of the 1st stage problem, with a time separable Stone-Geary utility function, can be written as follows: