Energy - BLUES

From IAMC-Documentation
Revision as of 20:20, 21 September 2017 by Alexandre Koberle (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Model Documentation - BLUES

Corresponding documentation
Previous versions
Model information
Model link
Institution COPPE/UFRJ (Cenergia), Brazil, http://www.cenergialab.coppe.ufrj.br/.
Solution concept General equilibrium (closed economy)
Solution method Optimization
Anticipation

Techno-economic parameters that form the input deck of COPPE-MSB were derived from various sources (Koberle et al., 2015; Nogueira et al., 2014; J Portugal-Pereira et al., 2016; Soria et al., 2015). Techno-economic input parameters of IAMs in general, and also of COPPE-MSB, include specific investment costs (CAPEX, in US$/kW), construction times (years), conversion efficiency (%), and any technical or economic specifications that may be required to appropriately model the performance of an energy technology (investment and O&M costs, minimum utilization time, inputs and outputs, auxiliary inputs and secondary outputs among others).