Temporal dimension - POLES: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
mNo edit summary |
||
| Line 4: | Line 4: | ||
}} | }} | ||
The model runs with a 1 year time step, usually from 1990 to 2050, the 1990-2015 period being almost entirely set by data and used for calibration. In the context of the ADVANCE project it has been run up to 2100. | |||
Latest revision as of 16:53, 22 December 2016
| Corresponding documentation | |
|---|---|
| Previous versions | |
| Model information | |
| Model link | |
| Institution | JRC - Joint Research Centre - European Commission (EC-JRC), Belgium, http://ec.europa.eu/jrc/en/. |
| Solution concept | Partial equilibrium (price elastic demand) |
| Solution method | SimulationRecursive simulation |
| Anticipation | Myopic |
The model runs with a 1 year time step, usually from 1990 to 2050, the 1990-2015 period being almost entirely set by data and used for calibration. In the context of the ADVANCE project it has been run up to 2100.