Temporal dimension - AIM-Hub: Difference between revisions

From IAMC-Documentation
Jump to navigation Jump to search
m (Rineke Oostenrijk moved page Temporal dimension - AIM-CGE to Temporal dimension - AIM-Hub without leaving a redirect: Text replacement - "AIM-CGE" to "AIM-Hub")
m (Text replacement - "IsDocumentationOf=AIM-CGE" to "IsDocumentationOf=AIM-Hub")
 
Line 1: Line 1:
{{ModelDocumentationTemplate
{{ModelDocumentationTemplate
|IsDocumentationOf=AIM-CGE
|IsDocumentationOf=AIM-Hub
|IsEmpty=No
|IsEmpty=No
|DocumentationCategory=Temporal dimension
|DocumentationCategory=Temporal dimension
}}
}}
In terms of temporal scale, the base year of AIM/CGE is 2005. AIM/CGE can be run for the 2005--2100 period. For some applications, the model is run up to 2050. The time step of the model solution is one year.
In terms of temporal scale, the base year of AIM/CGE is 2005. AIM/CGE can be run for the 2005--2100 period. For some applications, the model is run up to 2050. The time step of the model solution is one year.

Latest revision as of 14:19, 15 June 2020

Model Documentation - AIM-Hub

Corresponding documentation
Previous versions
Model information
Model link
Institution National Institute for Environmental Studies (NIES), Japan, https://www.nies.go.jp/index-e.html., Kyoto-University (Kyoto-University), Japan, https://www.kyoto-u.ac.jp/en.
Solution concept General equilibrium (closed economy)
Solution method Simulation
Anticipation

In terms of temporal scale, the base year of AIM/CGE is 2005. AIM/CGE can be run for the 2005--2100 period. For some applications, the model is run up to 2050. The time step of the model solution is one year.