Grid, pipelines and other infrastructure - GEM-E3: Difference between revisions

From IAMC-Documentation
Jump to navigation Jump to search
(Edited automatically from page GEM-E3 setup.)
 
No edit summary
Line 3: Line 3:
|DocumentationCategory=Grid, pipelines and other infrastructure
|DocumentationCategory=Grid, pipelines and other infrastructure
}}
}}
In the GEM-E3 model the transmission and distribution of electricity are represented at aggregate level. "Electricity" sector accounts for transmission and distribution. No details are included with regards to the electricity grid, pipelines and transmission and distribution infrastructure. Data from Eurostat, IEA and USA DOE have been employed so as to calculate the transmission and distribution costs by technology.

Revision as of 12:41, 30 August 2016

Model Documentation - GEM-E3

Corresponding documentation
Previous versions
Model information
Model link
Institution Institute of Communication And Computer Systems (ICCS), Greece, https://www.iccs.gr/en/.
Solution concept General equilibrium (closed economy)
Solution method Optimization
Anticipation

In the GEM-E3 model the transmission and distribution of electricity are represented at aggregate level. "Electricity" sector accounts for transmission and distribution. No details are included with regards to the electricity grid, pipelines and transmission and distribution infrastructure. Data from Eurostat, IEA and USA DOE have been employed so as to calculate the transmission and distribution costs by technology.