Grid, pipelines and other infrastructure - GEM-E3: Difference between revisions
Jump to navigation
Jump to search
(Edited automatically from page GEM-E3 setup.) |
No edit summary |
||
(2 intermediate revisions by 2 users not shown) | |||
Line 3: | Line 3: | ||
|DocumentationCategory=Grid, pipelines and other infrastructure | |DocumentationCategory=Grid, pipelines and other infrastructure | ||
}} | }} | ||
In the GEM-E3 model the transmission and distribution of electricity are represented at aggregate level. "Electricity" sector accounts for transmission and distribution. Data from Eurostat, IEA and USA DOE have been employed so as to calculate the transmission and distribution costs by technology. |
Latest revision as of 17:51, 21 October 2016
Corresponding documentation | |
---|---|
Previous versions | |
Model information | |
Model link | |
Institution | Institute of Communication And Computer Systems (ICCS), Greece, https://www.iccs.gr/en/. |
Solution concept | General equilibrium (closed economy) |
Solution method | Optimization |
Anticipation |
In the GEM-E3 model the transmission and distribution of electricity are represented at aggregate level. "Electricity" sector accounts for transmission and distribution. Data from Eurostat, IEA and USA DOE have been employed so as to calculate the transmission and distribution costs by technology.