Temporal dimension - AIM-Hub: Difference between revisions

From IAMC-Documentation
Jump to navigation Jump to search
No edit summary
 
m (Text replacement - "IsDocumentationOf=AIM-CGE" to "IsDocumentationOf=AIM-Hub")
 
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{ModelDocumentationTemplate
{{ModelDocumentationTemplate
|IsDocumentationOf=AIM-CGE
|IsDocumentationOf=AIM-Hub
|IsEmpty=No
|IsEmpty=No
|DocumentationCategory=Temporal dimension
|DocumentationCategory=Temporal dimension
}}
}}
In terms of temporal scale, the base year of AIM/CGE is 2005. AIM/CGE can be run for the 2005--2100 period. For some applications, the model is run up to 2050.
In terms of temporal scale, the base year of AIM/CGE is 2005. AIM/CGE can be run for the 2005--2100 period. For some applications, the model is run up to 2050. The time step of the model solution is one year.

Latest revision as of 15:19, 15 June 2020

Model Documentation - AIM-Hub

Corresponding documentation
Previous versions
Model information
Model link
Institution National Institute for Environmental Studies (NIES), Japan, https://www.nies.go.jp/index-e.html., Kyoto-University (Kyoto-University), Japan, https://www.kyoto-u.ac.jp/en.
Solution concept General equilibrium (closed economy)
Solution method Simulation
Anticipation

In terms of temporal scale, the base year of AIM/CGE is 2005. AIM/CGE can be run for the 2005--2100 period. For some applications, the model is run up to 2050. The time step of the model solution is one year.