Electricity - POLES: Difference between revisions

From IAMC-Documentation
Jump to navigation Jump to search
No edit summary
mNo edit summary
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
|DocumentationCategory=Electricity
|DocumentationCategory=Electricity
}}
}}
The electricity system consists on 3 main parts:
 
The electricity system consists of 3 main parts:
 


== Demand load curve ==
== Demand load curve ==


The load curve is derived form sectoral electricity demand (depending on the type of use), net trade and losses. POLES considers 2 typical days (winter and summer), each split into 12 time arrays of 2 hours each. A demand load curve is derived for each sector and each country along these 24 time blocks (2 days * 12 periods).


== Production ==
The model considers 2 typical days (winter and summer), each split into 12 time arrays of 2 hours each. The demand load curve is derived from the sum of sectoral electricity demand load curves (end uses), net trade and losses.
 
In the POLES-ADVANCE version these two days are the base of 27 days each, which are the combinations of low, medium and high situations for demand, wind production and solar production. This way, extreme situations are taken into account in the operation and planning of the power system.
 


The electricity production system involves different power generation systems:
== Operation (production and storage) ==


# Decentralised production (decentralised PV, autoproduction, ..), that may depend on the days / hour.
The model considers first the non-dispatchable energy sources (hydro, wind, solar). The residual load is met by dispatchable generators based on their variable costs (efficiency and fuel cost, including additional taxes or financial support schemes). A proxy for the power price is computed based on the marginal producer's cost. Storage technologies and demand response (which shift a part of the load to another time slice of a given day) are used if the within-day spread of two-hourly prices compensates their efficiency losses. The number of full load hours of each production and storage technology is the weighted aggregation of these 54 days.
Some over production can appear when the non-dispatchable productions (also taking into account a minimum power output for must-run technologies) exceed demand. When possible it is stored; otherwise it is curtailed and the load factors of wind and solar are decreased accordingly.


# Centralised production, that need to fill the difference between total demand and decentralised production. The model considers various degree of flexibility of the production means, and thus different abilities to meet the peak / base load curves. Three types of technologies are defined: intermittent sources (wind and solar w/o storage), must-run source (nuclear and some hydro, with little ability to adapt), merit order sources (fossil fuels and biomass as well as some hydro, with higher ability to adapt).  Based on these load curve constraints, production depends on variable production costs (efficiency and fuel cost, including addition taxes or financial support schemes).


== Capacity planning ==  
== Capacity planning ==


The planning of new capacities needs to adress expected future electricity needs while considering the upcoming decomissioning of existing plants. The model calculates theoretical technnology market shares for various duration blocks (730h to 8760h), from total production cost by duration block and infrastructure (/ reality) coefficients that are calibrated to replicate historical technology mix. The development of new capacities depend on these theoretical market shares, development, resource constraints and identified &quot;new&quot; needs (net of decomissioned plants).<br /> Total production cost is the sum of fixed cost (investment, lifetime, discount rate, fixed OM) and variable cost (fuel cost, efficiency, variable O&amp;M), including further taxes or financial support schemes. Investment costs evolve with learning functions (exogenous, endogenous 1 factor, endogenous 2 factors), efficiency evolves exogenously, other parameters can be differentiated by country and technology, fuel costs are derived from endogenous fuel prices and assumptions on taxation policies.


[[File:36405512.png]]
The planning of new capacities needs to address expected future electricity needs (based on a rolling ten-year extrapolation) while considering the upcoming decommissioning of existing plants (with vintage) and the special contribution of wind and solar (non-dispatchable).  
'''Figure 1'''. Electricity production technologies in POLES.


In addition to the technologies mentioned in Figure 1, one POLES version includes a further details of biomass technologies in the EU, based on work with the GREEN-X model.
The 648 time-slices per year (54*12) are organised in seven blocks with expected capacity factors of 8760 hours, 8030 hours, 6570 hours, 5110 hours, 3650 hours, 2190 hours and 730 hours. The associated number of full load hours define different total production costs for each of these blocks. This defines the theoretical technology market shares together with coefficients that are calibrated to replicate historical technology mix.
Non-dispatchable wind and solare are first determined, in competition with all technologies. However, they don't produce constantly on all seven blocks. Once their capacity is decided (limited by a maximum potential), the remaining need per investment block is updated with the actual production of wind and solar (which is deduced from the current participation of wind of solar in each block).  


== Electricity prices ==  
The dispatchable technologies are then planned based on the remaining capacity needs for each investment block, the theoretical market shares and the resource constraints for some technologies.
 
<figtable id="POLES_tab_1">
{| class="wikitable"
|+<caption>Electricity production technologies in POLES</caption>
!Fuel
!Technologies
|-
|rowspan="2"|Nuclear
|Conventional nuclear design
|-
|New nuclear design ("Generation IV")
|-
|rowspan="6"|Coal
|Pulverized fluidized coal
|-
|Pulverized fluidized coal with CCS
|-
|Integrated coal gasification with combined cycles
|-
|Integrated coal gasification with combined cycles with CCS
|-
|Conventional coal thermal turbine
|-
|Conventional lignite thermal turbine
|-
|rowspan="6"|Gas
|Conventional gas thermal turbine
|-
|Gas turbine
|-
|Gas combined cycles
|-
|Gas combined cycles with CCS
|-
|CHP (decentralized)
|-
|Gas fuel cell (decentralized)
|-
|rowspan="2"|Oil
|Conventional oil thermal turbine
|-
|Oil combined cycles
|-
|rowspan="3"|Biomass
|Conventional biomass thermal turbine
|-
|Biomass gasification
|-
|Biomass gasification with CCS
|-
|rowspan="3"|Hydro
|Run-of-river
|-
|Reservoir (lake)
|-
|Small hydro (<10 MW)
|-
|rowspan="2"|Wind
|Onshore
|-
|Offshore
|-
|rowspan="4"|Solar
|Utility PV
|-
|Distributed PV (decentralized)
|-
|Solar thermal power
|-
|Solar thermal power with storage
|-
|Ocean
|Tidal & wave ocean
|-
|Geothermal
|Geothermal power
|-
|Other
|Hydrogen fuel cell (decentralized)
|-
|rowspan="3"|Storage
|Pumped hydro
|-
|Compressed air
|-
|Batteries (lithium ion)
|-
|rowspan="2"|Demand-side solutions
|Vehicle-to-grid
|-
|Load shifting
|}
</figtable>
 
In addition to the technologies mentioned in the figure above, one POLES version includes further detail of biomass technologies in the EU, based on work with the GREEN-X model.
 
 
== Electricity prices ==
 
Total production cost is the sum of fixed cost (investment, discount rate, fixed O&M) and variable cost (fuel cost, efficiency, variable O&M), including further taxes or financial support schemes. Investment costs evolve with learning functions (exogenous, endogenous 1 factor, endogenous 2 factors). Efficiency is exogenous. Fuel costs are derived from endogenous fuel prices and assumptions on taxation policies.


Finally the POLES model calculates electricity prices from system production cost for base load (used to set the price for industry) and peak load (used to set the price for residential-services-transport).
Finally the POLES model calculates electricity prices from system production cost for base load (used to set the price for industry) and peak load (used to set the price for residential-services-transport).


Information sources include: Enerdata, Eurostat, IEA, ENTSO-E, ETDB
Information sources include: Enerdata, Eurostat, IEA[[CiteRef::WEO 2015]], ENTSO-E, ETDB, WEC[[CiteRef::WEC 2013a]], EC-JRC[[CiteRef::EC-JRC 2014]].
 
 
The model has been used to study the power system costs of mitigation policies under various configurations[[CiteRef::duscha2013co]][[CiteRef::griffin2013wh]]. The sysytem integration of variable renewables in the model has been tested in several studies[[CiteRef::després2016st]][[CiteRef::pietzcker2016sy]].

Latest revision as of 12:39, 3 February 2017

Model Documentation - POLES

Corresponding documentation
Previous versions
Model information
Model link
Institution JRC - Joint Research Centre - European Commission (EC-JRC), Belgium, http://ec.europa.eu/jrc/en/.
Solution concept Partial equilibrium (price elastic demand)
Solution method SimulationRecursive simulation
Anticipation Myopic

The electricity system consists of 3 main parts:


Demand load curve

The model considers 2 typical days (winter and summer), each split into 12 time arrays of 2 hours each. The demand load curve is derived from the sum of sectoral electricity demand load curves (end uses), net trade and losses.

In the POLES-ADVANCE version these two days are the base of 27 days each, which are the combinations of low, medium and high situations for demand, wind production and solar production. This way, extreme situations are taken into account in the operation and planning of the power system.


Operation (production and storage)

The model considers first the non-dispatchable energy sources (hydro, wind, solar). The residual load is met by dispatchable generators based on their variable costs (efficiency and fuel cost, including additional taxes or financial support schemes). A proxy for the power price is computed based on the marginal producer's cost. Storage technologies and demand response (which shift a part of the load to another time slice of a given day) are used if the within-day spread of two-hourly prices compensates their efficiency losses. The number of full load hours of each production and storage technology is the weighted aggregation of these 54 days. Some over production can appear when the non-dispatchable productions (also taking into account a minimum power output for must-run technologies) exceed demand. When possible it is stored; otherwise it is curtailed and the load factors of wind and solar are decreased accordingly.


Capacity planning

The planning of new capacities needs to address expected future electricity needs (based on a rolling ten-year extrapolation) while considering the upcoming decommissioning of existing plants (with vintage) and the special contribution of wind and solar (non-dispatchable).

The 648 time-slices per year (54*12) are organised in seven blocks with expected capacity factors of 8760 hours, 8030 hours, 6570 hours, 5110 hours, 3650 hours, 2190 hours and 730 hours. The associated number of full load hours define different total production costs for each of these blocks. This defines the theoretical technology market shares together with coefficients that are calibrated to replicate historical technology mix. Non-dispatchable wind and solare are first determined, in competition with all technologies. However, they don't produce constantly on all seven blocks. Once their capacity is decided (limited by a maximum potential), the remaining need per investment block is updated with the actual production of wind and solar (which is deduced from the current participation of wind of solar in each block).

The dispatchable technologies are then planned based on the remaining capacity needs for each investment block, the theoretical market shares and the resource constraints for some technologies.

<figtable id="POLES_tab_1">

Electricity production technologies in POLES
Fuel Technologies
Nuclear Conventional nuclear design
New nuclear design ("Generation IV")
Coal Pulverized fluidized coal
Pulverized fluidized coal with CCS
Integrated coal gasification with combined cycles
Integrated coal gasification with combined cycles with CCS
Conventional coal thermal turbine
Conventional lignite thermal turbine
Gas Conventional gas thermal turbine
Gas turbine
Gas combined cycles
Gas combined cycles with CCS
CHP (decentralized)
Gas fuel cell (decentralized)
Oil Conventional oil thermal turbine
Oil combined cycles
Biomass Conventional biomass thermal turbine
Biomass gasification
Biomass gasification with CCS
Hydro Run-of-river
Reservoir (lake)
Small hydro (<10 MW)
Wind Onshore
Offshore
Solar Utility PV
Distributed PV (decentralized)
Solar thermal power
Solar thermal power with storage
Ocean Tidal & wave ocean
Geothermal Geothermal power
Other Hydrogen fuel cell (decentralized)
Storage Pumped hydro
Compressed air
Batteries (lithium ion)
Demand-side solutions Vehicle-to-grid
Load shifting

</figtable>

In addition to the technologies mentioned in the figure above, one POLES version includes further detail of biomass technologies in the EU, based on work with the GREEN-X model.


Electricity prices

Total production cost is the sum of fixed cost (investment, discount rate, fixed O&M) and variable cost (fuel cost, efficiency, variable O&M), including further taxes or financial support schemes. Investment costs evolve with learning functions (exogenous, endogenous 1 factor, endogenous 2 factors). Efficiency is exogenous. Fuel costs are derived from endogenous fuel prices and assumptions on taxation policies.

Finally the POLES model calculates electricity prices from system production cost for base load (used to set the price for industry) and peak load (used to set the price for residential-services-transport).

Information sources include: Enerdata, Eurostat, IEAWEO 2015, ENTSO-E, ETDB, WECWEC 2013a, EC-JRCEC-JRC 2014.


The model has been used to study the power system costs of mitigation policies under various configurationsduscha2013cogriffin2013wh. The sysytem integration of variable renewables in the model has been tested in several studiesdesprés2016stpietzcker2016sy.